HCD / Steel engineering in Sri Lanka

Steel Factory Buildings

Your production process should shape the building. HCD can plan the steel structure, industrial floor, roofing and services around machinery, people, materials and future capacity.

Factory and industrial building completed by HCD for LAUGFS Rubber
↔Built around production

We begin with the process, equipment, working clearances and movement between areas.

◫Coordinated structure

We bring the steel frame, foundations, floors, roof and cladding into one agreed scope.

↗Planned for growth

Share your future capacity plans so building access and expansion can be considered early.

Factory solutions

Buildings That Support the Work Inside

Manufacturing, assembly and processing require different layouts. We can develop the structure and building envelope to suit your operation.

Wide internal space beneath the steel roof of an HCD industrial facility

Production and movement

Manufacturing Facilities

Plan the building around equipment positions, production flow, maintenance access and movement of materials. Clear height, column layout and floor loading can be reviewed together.

  • Equipment and production zones
  • Structural span and working height
  • Industrial floor and service routes
Discuss a manufacturing facility ↗
Industrial steel building work for the LAUGFS Rubber factory expansion

Flexible production layout

Assembly & Processing Buildings

Separate incoming materials, process areas, quality checks, staff circulation and dispatch as required. We can plan the steel building around those connections and your equipment brief.

  • Practical circulation and access
  • Ventilation, daylight and roof design
  • Space for plant and support functions
Plan your building ↗
HCD industrial facility expansion at LAUGFS Rubber

Increase capacity

Factory Extensions

A new production wing should connect sensibly to an existing facility. We can review the site, adjoining structure and operational constraints before proposing a structural approach.

  • Connection to the existing operation
  • Construction access and staging
  • Future loading and expansion needs
See the LAUGFS expansion ↗

Factory planning

Start With the Production Brief

We can develop the building more accurately when we understand what happens inside it each day.

01 / PROCESS

Production Flow

Map the route from incoming materials through production, inspection and dispatch.

02 / EQUIPMENT

Machinery & Loads

Identify equipment footprints, maintenance clearances and loads that affect the slab or structure.

03 / SPACE

Spans & Height

Check working height, column positions and space for lines, handling equipment or future changes.

04 / PEOPLE

Staff & Supervision

Plan safe circulation, access, welfare facilities and any integrated office or mezzanine area.

05 / ENVELOPE

Light & Ventilation

Review roofing, cladding, insulation, daylight, ventilation and rainwater management.

06 / SITE

Access & Expansion

Make room for goods vehicles, deliveries, service routes and future phases where possible.

HCD factory building project completed for LAUGFS Rubber in Millewa

HCD factory project / Millewa

LAUGFS Rubber Tyre Factory Complex

HCD designed and built a steel facility expansion for tyre manufacturing and storage. The project brings together an industrial structure, concrete foundations, roofing, flooring, skylights and an operational layout.

40 ft × 200 ftProject dimensions stated by HCD
Factory + storageProduction and material movement
Explore the completed project ↗

A closer look

Inside an HCD Industrial Build

Select a photograph to see the LAUGFS Rubber factory project in more detail.

Working with HCD

From Process Brief to Factory Building

We can coordinate the building works around your manufacturing requirement and agreed scope.

01

Share the Operation

Tell us the site, production process, equipment, floor area, height and target programme.

02

Plan the Layout

Work through zones, clearances, materials, staff movement and vehicle access.

03

Engineer & Fabricate

Develop the structural system, foundations and other components in the agreed design.

04

Construct on Site

Coordinate site work, steel erection, roofing, cladding and the specified finishes.

Support

Frequently Asked Questions

Send a process sketch, equipment list or existing plan if available. We can also start from a simple description of what you need to make.

Can HCD plan a factory around our production line?

Yes. Share machinery sizes, working clearances, material routes and service requirements. We can develop the building layout and steel structure around the operating brief.

Can the building include a mezzanine office?

We can review mezzanine and office space as part of the design. Its size and position depend on structural loading, access and how the factory will operate.

Can HCD build beside an operating factory?

We can assess an extension beside an existing operation. The site and access need review so construction can be planned around your operational constraints.

What affects the cost of a steel factory building?

Floor area, height, spans, machinery and slab loads, foundations, roofing, cladding, ventilation, services and site conditions affect the scope and cost. We will prepare a specific quotation.

What details should we provide first?

Share the location, approximate building dimensions, process, equipment, access, required height, any existing drawings and your preferred timeline.

Contact HCD

Plan Your Factory Building

Tell us what you produce, the space and equipment you need and where you plan to build. We will discuss a suitable structural and construction approach.

Call 076 332 8888
Email enquiries@hybridcargotecture.com

 


Back to the top